Use APKPure App
Get Flyover Design old version APK for Android
Scegliere il cavalcavia e la più alta qualità
The elevated bridge is a construction or building that serves to connect two parts of the road that are cut off by the obstacles such as deep valleys, river channels, lakes, irrigation channels, railways, highways that are not even a plane even the ocean.
Cast casting process using pre-stacked concrete begins with preparing a rough aggregate first. Next do the grouting / grout colodial work. Then the grout is mixed with sand, cement, and water to taste. Some also add additives such as plasticizer on a special stirrer.
Implementation of this method is very advantageous arabica casting process using a medium concrete mixture with an aggregate size of less than 40 mm. You can take advantage of additives that can increase the power of the concrete masonry mixture. The advantages of this casting technique by pumping, among others, can save the project cost budget plan (RAB), the need for a small workforce, the results are directly proportional to the initial preparation, and the level of productivity of the work was easily increased by increasing the pump capacity and improve the quality of the results.
Thank you
Caricata da
Kandee Kimochii
È necessario Android
Android 2.3.2+
Categoria
Segnala
Use APKPure App
Get Flyover Design old version APK for Android
Use APKPure App
Get Flyover Design old version APK for Android