Our website uses necessary cookies to enable basic functions and optional cookies to help us to enhance your user experience. Learn more about our cookie policy by clicking "Learn More".
Accept All Only Necessary Cookies
Crunchtime Impact

Crunchtime Impact

APK
0.0‪1K+
2.0.0(710) by CRUNCHTIME INFORMATION SYSTEMS, INC.
Jul 19, 2023Latest Version

More Information

  • Languages
    English 68
  • Requires Android
    Android 4.3+ (Jelly Bean MR2, API 18)
  • Content Rating
    Everyone
  • Architecture
    armeabi-v7a
  • Permissions
  • Signature
    b53a8a76697c7e03c4360e5417284ce764adb9d3

What's New in the Latest Version 2.0.0(710)

Jun 21, 2016

Added Date Picker and Left / Right arrows to home screen. (Net-Chef 05.20.xx.xx or higher)
Added Hierarchy Level Metrics (Net-Chef 05.20.xx.xx or higher)
Added the ability to add all metrics available in Today's Operating Metrics Widget in Net-Chef.
Drag & drop to re-order metrics
FIX- Improved time in application to match device time.
FIX- Fixed crashing on long press in Drill Down Menu.
FIX- Improved loading of Location / Time Slot data on Drill Down screens.

Show More
Download in Progress

Crunchtime Impact Download APK 2.0.0(710) (49.5 MB)

If the download doesn't start, Click here
How to install XAPK / APK file
Get the latest updates and news!Subscribe
How to install XAPK / APK file

All Variants

armeabi-v7a
Crunchtime Impact APK
2.0.0(710)(4332)APK
Jun 21, 201649.5 MBAndroid 4.3+
Download
Show More
tracking
Subscribe to APKPure
Be the first to get access to the early release, news, and guides of the best Android games and apps.
No thanks
Sign Up
Success!
You're now subscribed to our newsletter.
Subscribe to APKPure
Be the first to get access to the early release, news, and guides of the best Android games and apps.
No thanks
Sign Up
Subscribed Successfully!
You're now subscribed to APKPure.