ประมาณราคางานก่อสร้าง


0.5.0 by SURIYA SUKDANG
Jun 21, 2019

About ประมาณราคางานก่อสร้าง

Estimate the structure of the building.

1. Additional civil work '' Kor Sor Lor road, Asphaltic concrete road, Soil concrete wall '' ..... When filling the size of the work, the program will show the amount of work and can enter the unit price.

2. Price of material per unit, such as concrete, floor work, wall work, wall decoration, light wall work, blemish work, paint job ...... Can Can edit the material price According to that area

 3. Remove the reinforced concrete building structure material and estimate the price of reinforced concrete building structures. Can be fast within seconds

1. Foundations 2. Columns, ceilings 3, ceilings Wood = 30% of wood // nails = 0.30x, total amount of wood // wire = 0.018x Total iron

// Steel RB6 mm = Allowance 5% // Steel RB9 mm = Allowance 7% // Steel DB12 mm = Allowance 9% // Steel DB16 mm = Allow 11% // DB20 mm steel = Allowance of 13% // DB25 mm steel = 15% allowance

Units used as metric systems

Additional APP Information

Latest Version

0.5.0

Requires Android

4.4

Available on

Category

Tools App

Show More

ประมาณราคางานก่อสร้าง Alternative

Discover